ASR10 - DESIGN AND RETROFITTING WITH POST-INSTALLED SOLUTIONS |
WEDNESDAY | ||||||||
AMBER 6 | Convenors: G. Muciaccia, A. Sharma | ||||||||
14:30 - 14:40 | AN EXPERIMENTAL STUDY ON 2D AND 3D BEAM-COLUMN JOINTS RETROFITTED WITH POST-INSTALLED HAUNCHES M. Tonidis, V. Birtel, A. Sharma | |||||||
14:40 - 14:50 | AXIAL BEHAVIOR OF PARTIALLY BONDED POST-INSTALLED ADHESIVE ANCHORAGE FOR RETROFIT APPLICATIONS M. Morano, T. Hutchinson, R. Piccinin, J. Silva | |||||||
14:50 - 15:00 | BOND-SLIP MODEL OF EPOXY ADHESIVE ANCHORS TO FROZEN DAMAGED CONCRETE Y. Yano, Y. Takase | |||||||
15:00 - 15:09 | EXPERIMENTAL INVESTIGATION OF CONNECTION STIFFNESS FOR SINGLE HAUNCH SEISMIC RETROFITTING SYSTEM A. Zabihi, J. Lee, H. Tsang, E. Gad | |||||||
15:09 - 15:18 | EXPERIMENTAL STUDY ON AN ATTACHED RC FRAME USING HIGH STRENGTH ANCHOR BOLTS T. Chiou, K. Teng, L. Chung, T. Lee | |||||||
15:18 - 15:27 | EXPERIMENTAL TESTING OF RC FRAME RETROFITTED WITH STEEL BRACE USING POST-INSTALLED CHEMICAL ANCHORS D. Tewatia, P.C.A. Kumar | |||||||
15:27 - 15:36 | EXPERIMENTAL INVESTIGATION ON THE RESPONSE OF SUBSTANDARD RC FRAMES RETROFITTED WITH RC INFILL WALLS T. Papatheocharis, V. Koutselinis, M. Moretti, P. Perdikaris | |||||||
15:36 - 15:45 | HAUNCH RETROFIT OF RC BEAM-COLUMN JOINT: FASTENING ASSESSMENT A. Marchisella, G. Muciaccia | |||||||
THURSDAY | ||||||||
MONITOR 4 | Convenors: G. Muciaccia, A. Sharma | ||||||||
09:00 - 09:11 | SEISMIC PERFORMANCE OF MULTI-STORY REINFORCED CONCRETE WALL WITH NEW OPENING AT 1ST FLOOR A. Nakamura, T. Mukai, K. Ariki | |||||||
09:11 - 09:22 | FRAGILITY CURVES FOR RC MOMENT FRAMES RETROFITTED WITH MORTAR WALLS AND STEEL WIRE MESH M. Herrera, D. Sosa, S. Diaz, E. Tasdemir, E. Guaminga | |||||||
09:22 - 09:33 | EFFECT OF APPLICATION ISSUES IN MASONRY CONFINEMENT WITH COMPOSITES G.P. Lignola, A. Prota | |||||||
09:33 - 09:44 | EXTENDING APPLICATION OF TITANIUM ALLOY BARS FOR RETROFITTING REINFORCED CONCRETE BUILDINGS H. Al-Ghanim, W. Alnahhal, M. Mashal, A. Al-Hamrani | |||||||
09:44 - 09:55 | NUMERICAL INVESTIGATIONS ON PULL-OUT BEHAVIOUR OF POST-INSTALLED REBARS IN RC UNDER CYCLIC LOADS D. Waghmare, A. Sharma | |||||||
09:55 - 10:05 | NUMERICAL STUDY ON THE BEHAVIOR OF ANCHORAGES WITH SUPPLEMENTARY REINFORCEMENT UNDER MOMENT LOADING D. Suthar, A. Sharma | |||||||
10:05 - 10:15 | PERFORMANCE TEST OF THE LONG POST-INSTALLED ANCHORS H. Sakai, K. Nakano, K. Imai, T. Numata, K. Ariki, K. Matsuzawa | |||||||
MONITOR 5 | Convenors: G. Muciaccia, A. Sharma | ||||||||
09:00 - 09:11 | SEISMIC PERFORMANCE OF SMALL SCREW ANCHORS FOR REDUNDANT NON-STRUCTURAL SYSTEMS T. Pokharel, C.C. Neupane, J. Lee, A. Amirsardari, E. Gad | |||||||
09:11 - 09:22 | RETHINKING THE ROLE OF THE CONNECTIONS TO IMPROVE THE SUSTAINABILITY OF THE RETROFIT ACTIONS S. Labò, J. Zanni, C. Passoni, A. Marini | |||||||
09:22 - 09:33 | PROGRESS IN SEISMIC DESIGN AND STRENGTHENING REDESIGN OF HOSPITALS. V. Davidovici | |||||||
09:33 - 09:44 | PERFORMANCE OF ANCHORAGES UNDER PREDOMINANT MOMENT LOADING: A NUMERICAL INVESTIGATION G. Chobe, A. Sharma | |||||||
09:44 - 09:55 | STUDY ON EFFECT OF SETTING LOCATION ON MECHANICAL PROPERTIES OF POST INSTALLED ANCHOR FOR CONCRETE S K. Katori, T. Osawa, K. Kobayashi | |||||||
09:55 - 10:05 | SUSTAINED PERFORMANCE CAUSED BY ADHESIVE POST-INSTALLED PLURAL ANCHORS SUBJECTED TO SHEAR FORCE Y. Tajima, K. Hoki | |||||||
10:05 - 10:15 | SEISMIC BEHAVIOR OF SEMI RIGID CONNECTIONS USING DISSIPATIVE POST-INSTALLED ANCHORS S. Arjmandzadeh, G. Muciaccia |