BCI8 - THE RENAISSANCE OF ACCELERATED BRIDGE CONSTRUCTION: THE EASIEST PATHWAY TO BUILD SEISMIC RESILIENCE |
TUESDAY | ||||||||
AMBER 7 | Convenors: A. Palermo, M. Mashal | ||||||||
14:30 - 14:40 | DESIGN AND NUMERICAL EVALUATION OF HYBRID ISOLATED-ROCKING PRECAST CONCRETE SEGMENTAL BRIDGE COLUMNS F. Ebrahimi, M. Salehi, E. Mohammadi, V. Broujerdian | |||||||
14:40 - 14:50 | DESIGN OF PRESTRESSED, JOINTED COLUMNS FOR ACCELERATED CONSTRUCTION AND ENHANCED SEISMIC PERFORMANCE T. Thonstad, M. Eberhard, J. Stanton | |||||||
14:50 - 15:00 | DEVELOPMENT OF A PRECAST ABUTMENT CONNECTION SUITABLE FOR RAPID CONSTRUCTION IN SEISMIC ZONES O.S. Haraldsson, B. Bessason, C.Y. Tsai, F. Sigurjonsson, I. Ólafsson, H.S. Ólafsson | |||||||
15:00 - 15:09 | ULTRA HIGH-PERFORMANCE CONCRETE (UHPC) JACKETING FOR THE SEISMIC RETROFIT OF BRIDGE PIERS M. Acharya, K. Hogarth, A. Ebrahimpour, M. Mashal | |||||||
15:09 - 15:18 | EXTERNAL SOCKET CONNECTIONS FOR THE SEISMIC DESIGN OF BRIDGES J.A. Samayoa, G.T. Proestos, M.J. Kowalsky | |||||||
15:18 - 15:27 | NOVEL ABC SYSTEMS ENABLING SELF-REPAIRING AND DECONSTRUCTION THROUGH ADDITIVE CONSTRUCTION I. Mantawy, A. Mackin, J. Migliorino, H. Shaker | |||||||
15:27 - 15:36 | PRECAST CONCRETE STAY-IN-PLACE FORMWORK TO PREVENT LOSS OF SEISMIC RESISTANCE DUE TO CORROSION H. Wang, P. Okumus, R. Ranade | |||||||
15:36 - 15:45 | SEISMIC VULNERABILITY ASSESMENT OF PRECAST POST-TENSIONED SEGMENTAL PIERS S. Kocakaplan, E. Ahmadi, M.M. Kashani | |||||||
WEDNESDAY | ||||||||
MONITOR 6 | Convenors: A. Palermo, M. Mashal | ||||||||
09:00 - 09:10 | EVALUATION OF BOND STRENGTH IN CONCRETE BRIDGES WITH NOVEL MATERIALS THROUGH MACHINE LEARNING MODELS L.A. Bedrinana, M. Acharya, J. Cantrell, M. Mashal | |||||||
09:10 - 09:20 | TOWARDS SEISMIC RESILIENCE OF PRECAST COLUMN-TO-PILE SHAFT ASSEMBLIES AMID CLIMATE CHANGE H. He, M. Xu, C. Yang | |||||||
09:20 - 09:30 | SIDE SHEAR STRENGTH OF MEMBER SOCKET CONNECTIONS FOR PRECAST BRIDGE CONCRETE SUBSTRUCTURE ELEMENTS C.N. Luong, C. Yang, M. Ezzeldin | |||||||
09:30 - 09:39 | DEVELOPMENT OF A MULTIPLE STEEL PIPE BRIDGE PIER INTEGRATED WITH PILE FOUNDATION K. Kodama, Y. Soga, T. Ando | |||||||
09:39 - 09:48 | EXPERIMENTAL STUDIES ON SEISMIC PERFORMANCE OF PREFABRICATED CIRCULAR HOLLOW BRIDGE COLUMNS W. Wei, C. Shao, W. Zhuang | |||||||
09:48 - 09:57 | NUMERICAL ANALYSIS ON SEISMIC PERFORMANCE OF PRECAST BRIDGE PIERS WITH PEDESTAL CONNECTION J. Zhang, Z. Wang, Z. Wu | |||||||
09:57 - 10:06 | SEISMIC PERFORMANCE OF DIGITALLY FABRICATED SEGMENTAL CONCRETE COLUMNS S. Raza, Z. Triantafyllidis, M. Shahverdi | |||||||
10:06 - 10:15 | SEISMIC RESPONSE OF UNBONDED PRECAST POST-TENSIONED BRIDGE PIERS WITH MULTI-ROCKING INTERFACES Y. Shen, F. Freddi, J. Li |